1950's Era HO Industrial Switching Layout
All photos have included captions.
Night Shift Workers
Although I sometimes think my switching layout is complete, on occasion while operating switchers in the yard, I find there is always room for improvement.
Although guy's put a lot of work in adding realism to their layouts, and although I had quite a few scale rail workers that populate my layout, I realized that I needed more. I also was careful to select period correct figurines for my 1950’s era switching layout.
Seen here are several workers I added amongst others I added elsewhere in the yard to add more realism to the layout.
Locomotive 8117 seen exiting a hidden spur now has a rail worker riding on the front of the locomotive for throwing switches as 8117 goes about switching. cars in the yard.
The other worker added seen standing by the pickup parked at the tire factory, is waiting patiently while the forklift operator unloads tire casings from the pickup.
- No Comments